Showing posts with label TEPCO. Show all posts
Showing posts with label TEPCO. Show all posts

No More Free Lunch at #Fukushima I Because TEPCO Ran Out of Boil-In-The-Bag Food??

Diposkan oleh Pengetahuan dan Pengalaman on Thursday, September 15, 2011

It's an unconfirmed bit of information from a Representative in the Lower House of Japan's Diet.

Yukiko Miyake says she had a chance to talk to Banri Kaieda, ex-Minister of Economy, Trade and Industry who lost the bid to become the party leader and the prime minister. According to her tweet on September 16:

本会議で海江田さんと話すチャンスがあった。一昨日連絡した作業員食事打ちきりの件をすぐ調べてくれた。打ちきりは事実で、私達も試食した真空パックの非 常食がなくなったということだが、内部被爆の問題もあり今までのものが安全に思える。全国にストックがあるはずではとのこと。

I had a chance to talk to Mr. Kaieda during the main session of the Diet. I had told him two days ago about the free lunches for the [Fukushima I] workers that were stopped. He immediately did some research, and said to me the following: "It is true that the free lunches were stopped, because the emergency boil-in-the-bag food ran out. But we have to worry about internal radiation exposure for the workers, and I think the boil-in-the-bag lunches are safer. I think boil-in-the-bag food is in stock throughout Japan."

So, TEPCO may have run out of boil-in-the-bag food stocked at Fukushima I and at J-Village, and it couldn't buy more and/or it couldn't ask for more.

I wonder how Mr. Kaieda is doing these days, relieved of the ministerial job. My personal vote for the new PM was actually Kaieda, despite all the badmouthing I did of him. Unlike ex-prime minister Kan and ex-cabinet secretary and current Minister of Economy and Trade Edano, Kaieda hasn't appeared in the media circuit (I almost wrote "circus") to peddle "his side" of the recent 6 months history of Japan's nuclear crisis.

New Prime Minister Noda has gone very quiet after becoming the PM, with some questionable appointments of ministers and party leaders including Mr. Maehara, who was revealed in WikiLeaks to have been informing Americans about Japanese politicians like Ichiro Ozawa.

More about → No More Free Lunch at #Fukushima I Because TEPCO Ran Out of Boil-In-The-Bag Food??

#Contaminated Water Treatment System at #Fuku I: TEPCO to Use SARRY Only from October

Diposkan oleh Pengetahuan dan Pengalaman

Just as I thought. TEPCO will ditch the Kurion-AREVA combo that has had numerous problems from the beginning and will rely solely on Toshiba (and IHI and US's Shaw)'s SARRY for highly contaminated water treatment. Toshiba's SARRY has had its share of problems but not as many as the Kurion-AREVA duo.

The latest trouble at the water treatment system: the density of radioactive materials, reduced after Kurion's treament, shot up again after AREVA's treatment.

From Mainichi Shinbun (9/15/2011):

 東京電力は15日、福島第1原発事故で生じた高濃度の放射性物質を含む汚染水を浄化して原子炉の冷却に使う「循環注水冷却システム」で、米キュリオン社の装置によって下がった放射性物質の濃度が、続いて仏アレバ社の装置を通すと上がるトラブルが起きたと発表した。アレバ社の装置が処理する高濃度の汚泥が流出した可能性もあり、原因を調べている。現在は、アレバ社の装置は止め、キュリオン社の装置だけで処理している。

TEPCO announced on September 15 that there was a trouble in the reactor cooling system that circulates water treated in the contaminated water treatment system. The density of radioactive materials that decreased after the treatment with Kurion's system increased after the treatment with AREVA's system. It is possible that highly radioactive sludge in AREVA's system leaked. TEPCO is investigating the cause. Currently, AREVA's system is stopped, and the treatment is done by Kurion's system alone.

 東電が同日、両社の装置の処理能力を確認したところ、キュリオン社単独では汚染水の放射性物質の濃度が1立方センチ当たり数百万ベクレルから数百ベクレルまで下がったが、その汚染水を続けてアレバ社の装置で処理すると、逆に数十万ベクレルに上がった。

TEPCO looked at the treatment performance of both systems and found that Kurion's system had reduced the density of radioactive materials from several million becquerels/cubic centimeter to several hundred becquerels/cubic centimeter. However, when that treated water was further processed in AREVA's system, the density shot up to several hundred thousand becquerels/cubic centimeter.

 東電は10月以降、キュリオン社とアレバ社の装置を組み合わせた浄化システムを止め、比較的故障が少ない東芝製の別の浄化装置「サリー」で汚染水を浄化する方針だ。

TEPCO plans to stop using Kurion-AREVA system starting October, and use Toshiba's SARRY exclusively for contaminated water treatment. SARRY has had a relatively small number of failures compared to Kurion's or AREVA's system.

TEPCO was working on both Kurion's and AREVA's system from September 13, replacing a pump at Kurion's and a stirrer in the coagulation settling unit at AREVA's. Maybe that had something to do with the problem. Maybe not. TEPCO is not very forthcoming, as you may have noticed over the past 6 months.

More about → #Contaminated Water Treatment System at #Fuku I: TEPCO to Use SARRY Only from October

There Will Be No Free Lunch for Fuku I Workers Any More, As TEPCO Stops Providing

Diposkan oleh Pengetahuan dan Pengalaman on Wednesday, September 14, 2011

citing "normalcy" at Fukushima I Nuclear Power Plant. Instead, TEPCO will sell "bento" lunch boxes at the plant. No information yet on how much TEPCO will charge.

Normalcy.

From September 14 (JST) tweets by Ryuichi Kino, independent journalist who's been covering TEPCO press conferences from the beginning of the crisis:

東電は、ふくいちの現場で支給していたお弁当を廃止。これからは、ふくいちでお弁当を売るとのこと。注文して、受け取るようになるらしい。価格は、確認中。でも個人的には、弁当になっても支給すべきと思う。

TEPCO stopped providing bento lunches at Fukushima I. From now on, the company will sell bento at Fukushima I. Workers are to pre-order in order to get bento. Asking how much TEPCO will charge for bento. Personally they should continue to provide lunch for free.

これまでふくいちは、放射線の関係でお弁当を持ち込むことができなかったので、現場でレトルトを温めていた。だからレトルトを支給していたと、東電・松本さん。でも状況が安定してきてレトルトでなくても大丈夫になったので、お弁当にすると。

TEPCO's Matsumoto explains the company has been providing [for free] boil-in-the-bag food because high radiation at the plant prevented [workers] from bringing in bento. But the situation has stabilized at the plant, and the boil-in-the-bag food is no longer necessary, so the company is switching to bento, Matsumoto says.

松本さん曰く、今は平常時になってきているので、食事も各自がお弁当を持ってきたり、買ってきたりすることができる。だから支給の必要はないという説明。う〜ん、なんかヘン。

Matsumoto says now that things are getting back to normal, the workers can bring their own bento or purchase one, and so there is no need to provide free lunch. Hmmm, it doesn't make sense to me.

そもそも福島第一周辺は店なんかあいてないし、発電所からは出れないし、未明3時とかに宿を出ないといけないし、自分の家から通ってるわけじゃないから弁当を作るわけにもいかない。これを平常時というのは、どういうことなんだろう?

To begin with, there is no store open anywhere near Fukushima I Nuke Plant. Workers cannot leave the plant [during the work], and they have to leave for work at early hours like 3 in the morning. They are not commuting from their own homes so they cannot make their own bento. How can he called it "normal"?

だいたい作業員の食事くらい面倒みればいいのにと思うし、弁当を買わせたら、単に東電のコスト減、作業員の個人負担増ということになる。そう思って聞いてみたら、「今は平常時に戻って・・・云々」という同じ回答が何度も返ってきた。

Why can't TEPCO take care of the meals for the workers? Having them purchase bento will reduce TEPCO's cost, and increase personal cost to the workers. I asked [if it's TEPCO's cost reduction measure], but Matsumoto just repeated "Things are now back to normal..."

要するにコスト削減なんですか?と聞いたら、また「そういうことではなく、今は平常時・・・」。よくわからないけど、やっぱりコスト削減なんだろうな。でも作業員の給料が上がるわけじゃないから、現場に負担を押しつけてるだけでしかない。

Is it TEPCO's cost reduction? "It's not that, but things are getting normal..." I guess what it means is indeed the cost reduction. But the wages for the workers are being raised. It's just shifting the burden on the workers.

複数の下請け会社を抜けるから、作業員の手に渡るお金は多くない。作業員の暮らしは平時とはほど遠い。東電はそれをわかってて弁当支給を打ち切るんだから、コストダウン以外の理由が思い浮かばない。こんなところで士気を下げてどうするんだろう・・・。

The net wages to the workers, after the multiple layers of subcontractors take their cut, are not that much. The living condition of the workers is far from "normal". TEPCO must know that, but still stops providing free lunch. I can't think of any other reason but cost reduction. What is the company thinking, weakening the morale of the workers like this?

And the national government and the Fukushima prefectural government continue to look the other way. Many of these workers are from Fukushima Prefecture, some from the very towns where Fukushima I Nuke Plant is located, but the governor of Fukushima is more keen on securing the next big "dango" businesses which will include "decontamination" and debris clearing and medical data collection/research. NISA said early on in the crisis that it "had no plan to do anything about the situation of food for the workers, as it is TEPCO's problem".

Those rich philanthropists (cum business tycoons) in Japan completely ignore Fukushima I Nuke Plant or the workers. Masayoshi Son, of Softbank for example, has given 10 billion yen (US$130 million) to Miyagi Prefecture for its dubious disaster relief plan. A fraction of that money could provide free bento for the workers at Fukushima.

Let's see... Bento 500 yen a piece, workers 3,000. 1.5 million yen per day. It's been about 180 days. So TEPCO may have spent the total 270 million yen, or about US$3.5 million so far. Annually, it would be 540 million yen, or about US$7 million.

Well, it looks all TEPCO needs to do is to say to ex-President Shimizu, "Sorry, we have to have your fat severance paycheck back".

Or why can't the plant workers receive some of the donation money generously given by people from all around the world, so they can buy lunch? The money is still sitting at all levels - national, prefectural, municipal.

More about → There Will Be No Free Lunch for Fuku I Workers Any More, As TEPCO Stops Providing

TEPCO Did It Again - Blacked-Out Table of Contents

Diposkan oleh Pengetahuan dan Pengalaman on Monday, September 12, 2011

of the severe accident manual that was demanded on September 6 by a Diet committee.

On instruction from the regulatory agency Nuclear and Industrial Safety Agency, TEPCO submitted an almost completely blacked-out document. Not satisfied, to say the least, the committee asked for re-submission.

NISA accordingly instructed (the link is in Japanese, PDF) TEPCO again on September 8, telling the company to "report to the agency by 6PM as to what conditions are necessary for the disclosure of the information, if any".

On September 12, TEPCO submitted the front cover and the table of contents of the document "Operation Manual for Reactor 1 (Severe Accident)", 3 pages total, with 48 lines out of 50 were blacked out. All the lawmakers in the committee could read was "fire extinguishing line" and "inert gas".

TEPCO's Matsumoto explained that the manual is a company's internal document and not for public consumption, and the company has to protect intellectual properties and the physical protection of nuclear facilities. (Information from Asahi Shinbun, 9/12/2011)

We can blame TEPCO all we want. But again, the company is following instruction from NISA, and NISA makes no effort to have the information disclosed.

The Diet committee is asking for re-re-submission.
More about → TEPCO Did It Again - Blacked-Out Table of Contents

TEPCO Video Explains the Reactor Cooling System at Fukushima I Nuke Plant

Diposkan oleh Pengetahuan dan Pengalaman on Sunday, September 11, 2011

TEPCO is on the PR blitz of some sort. Now, the first series of the blitz is "How do we achieve and maintain cold shutdown?" (「冷温停止の実現と維持はどうやって実施するのですか?」), and the company released the first video of the series titled "The setup and operation of the reactor cooling system".

It can be viewed or downloaded at TEPCO's site, but I embedded the video from Youtube below. The video is in Japanese only, but take a look at the "system" made up of jumbled flexible hoses (Kanaflex) snaking their way through the plant compound. The person who explains the system for you is Junichi Matsumoto, TEPCO's spokesman for the Fukushima I Nuke Plant accident.


For readers who read Japanese, for your weekend fun: Turn on the Transcribe Audio feature of the video. You get to see some hilarious kanji characters assigned for the phonetic pronunciation, or phonetic pronunciation that Google mishears. Some fun words I noticed:

  • "Chusui" - water injection, is transcribed as "Appendix"

  • "Nanbah-ichi" - number 1, is transcribed as "Nanba (place name in Osaka) 1"

  • "Roshin" - reactor core, is transcribed as "credit union"

  • "Ponpu" - pump, is transcribed as "high school"

  • "Sai Rinkai" - recriticality, is transcribed as "recent household"

  • "Tadachi ni Hosan-sui o chunyu suru" - immediately inject boric acid solution, is transcribed as "only the locally made products is injected"

More about → TEPCO Video Explains the Reactor Cooling System at Fukushima I Nuke Plant

#Fukushima I Nuke Plant: Steel Frame for Cover for Reactor 1 Is Ready

Diposkan oleh Pengetahuan dan Pengalaman on Saturday, September 10, 2011

On September 10, the workers started to set up the panels. Soon, all you'll get to see from Google Earth will be the Reactor 1 as if nothing happened.

Looking at Fuku-1 Livecam video, the bottom third is already covered with panels.

From TEPCO's Photo for the Press page:


See the tall crane in action moving the panel, from 9/10/11 Livecam video (about 1 minute into the video):

More about → #Fukushima I Nuke Plant: Steel Frame for Cover for Reactor 1 Is Ready

TEPCO Dumps 565-Page Report on Early Days of Crisis, Says No Re-Melting of Reactor 3 Fuel

Diposkan oleh Pengetahuan dan Pengalaman on Friday, September 9, 2011

"WTF?" seems to have been literally the reaction by both the journalists who regularly cover TEPCO and the officials at the regulatory agency Nuclear and Industrial Safety Agency.

NISA nor any government agency asked for the report, but TEPCO apparently volunteered. The voluminous data is supposed to refute the claim by certain researchers that the melted fuel at the bottom of the RPV in Reactor 3 may have been re-melted on March 21 and went through the RPV and dropped on the floor of the Containment Vessel, releasing a huge amount of radioactive materials as evidenced by large spikes in air radiation throughout Tohoku and Kanto on that day.

According to TEPCO, there was no re-melt, because their data shows that the amount of water into Reactor 3 RPV was more than adequate, and the spikes in air radiation was simply because of the rain, and had nothing to do with what was happening in Fukushima I Nuclear Power Plant.

The 565-page report also covers the other reactors.

I think I know what this is all about. It's TEPCO's defense and counterattack against the former Kan administration officials like Cabinet Secretary Edano and Prime Minister Kan himself, who, upon resigning, immediately started the media blitz to spread their versions of the event, painting themselves as selfless heroes worried for the humanity and TEPCO as the sole villain.

TEPCO's report on September 9 in Japanese:

http://www.tepco.co.jp/cc/press/betu11_j/images/110909m.pdf

The company promises it will upload the English translation as soon as it is done.

In the press conference on September 9, TEPCO released these charts as part of the evidence that there was no re-melt. TEPCO's translation is just as bad as the man who pointed finger at TEPCO livecam, but I hope the charts speak volume:




More about → TEPCO Dumps 565-Page Report on Early Days of Crisis, Says No Re-Melting of Reactor 3 Fuel

Ocean Contamination 3 Times As Much As TEPCO Announced

Diposkan oleh Pengetahuan dan Pengalaman on Thursday, September 8, 2011

says the government corporation Japan Atomic Energy Agency, 5 months after the leak of highly contaminated water was first discovered (in April) at the water intake for Reactor 2 at Fukushima I Nuclear Power Plant.

So, instead of 4,700 terabecquerels of radioactive iodine and cesium as TEPCO announced back in May, JAEA says it was 15,000 terabecquerels that leaked into the Pacific Ocean, and that it could have been leaking since March 21, not from April 1.

From Yomiuri Shinbun (9/9/2011):

東京電力福島第一原子力発電所の事故で、汚染水や大気中からの降下分も含めて、海に流出した放射性物質の総量を1万5000テラ・ベクレル(テラは1兆倍)とする試算を、日本原子力研究開発機構の小林卓也研究副主幹らがまとめた。

Researchers at Japan Atomic Energy Agency (JAEA) led by Takuya Kobayashi has come up with the estimate that puts the total amount of radioactive materials leaked into the ocean from Fukushima I Nuclear Power Plant at 15,000 terabecquerels. Their estimate includes the radioactive materials in the contaminated water and in the air that fell in the ocean.

 東電が推定した値の3倍以上になっている。19日から北九州市で始まる日本原子力学会で発表する。

The JAEA estimate is three times as much as the estimate by TEPCO. It will be announced during the Atomic Energy Society of Japan conference set to begin in Kitakyushu City from September 19.

 東電は高濃度汚染水の流出を4月1~6日に限定しており、その間の放射性物質(ヨウ素131、セシウム134、137)の量を4700テラ・ベクレルと推定していた。

TEPCO limited the time period of the contaminated water leak from April 1 to 6, and estimated the amount of iodine-131, cesium-134 and cesium-137 to be 4,700 terabequerels.

 小林副主幹らは、原発の取水口付近での放射性物質の濃度をもとに、海で放射性物質が初めて検出された3月21日から4月30日までの流出量を逆算した。推計値をもとに海洋への拡散を模擬計算したところ、原発の周辺海域での観測値に合っていることも確かめた。試算ではセシウム134を含めていないため、総量はより多くなる。

Kobayashi et al calculated the amount of the leaked water from March 21 to April 30, based on the density of radioactive materials at the water intake of the plant. March 21 was when radioactive materials were detected in seawater for the first time. They also did the simulation of how the radioactive materials spread in the ocean based on their estimate, and confirmed that it matched the observed data in the ocean near the plant. The estimate does not include cesium-134, so the total amount of radioactive materials would be higher.

So the researchers concluded the leak may have been ongoing since March 21, based on the density of radioactive materials at the water intake that TEPCO was announcing. Duh. And TEPCO insisted that the leak started on April 1 or not so long before a worker noticed for the first time, and no one in the media questioned at that time. No one is saying anything now either about this extremely contaminated water that may have been leaking for 10 days before TEPCO even noticed.

(Note to self: Think.)

Asahi Shinbun has different details:

  • The main factor that pushed the number up was the radioactive materials in the air that fell into the ocean;

  • Iodine-131 alone accounts for 11,400 terabecquerels, and cesium-137 for 3,600 terabecquerels.

Well I sure hope this number for cesium-137 is "iodine-131 equivalent". Otherwise the total amount of radioactive materials leaked would be approaching INES Level 7 on its own.

These government researchers are announcing their precious studies left and right, now that their papers have been peer-reviewed and set to be published.

More about → Ocean Contamination 3 Times As Much As TEPCO Announced

Here's the Man Who Pointed Finger at TEPCO's Fuku I Livecam

Diposkan oleh Pengetahuan dan Pengalaman

Some of you may have read about and seen the video/screenshot of a mysterious worker who appeared in TEPCO's Livecam of Fukushima I Nuclear Power Plant.


Well, he's gone semi-public with his email to a high ranking administration official on September 8, protesting the harsh working conditions for the workers, and he has posted his statement and photographs inside the plant on his website:

http://pointatfuku1cam.nobody.jp/e.html

Scroll down for his English explanation. It's not the perfect English but you get the gist. (Well, actually it is rather hard to follow, compared to the original Japanese which is relatively clear.)

One of the photos he has: A cute poster warning against the danger of heat exhaustion... "Don't get too hot", the girl says.


Here's the part where he explains why he did what he did:

The intention of pointing toward Tepco, the goverment and the claim for them

I claim the concrete improvement of the state of working conditions, entrustment of businesses to subcontract companies, ascertainment of all workers’ employment situations.

As you know according by the reports from some media, there are some workers who have some compelling reason were arranged by the people in the outlaw territory. And they work while hiding from the prime contractor that they are in unfair or harsh conditions.

Even the case of the company recruiting through the Hello Work (Japanese government employment agency), the prime contractor don’t know some workers’ actual employer.

Too many subcontracts cause some problems of the workers’ low wages or not to join the insurances, no contract documents, as known by reports of media.

In addition, I show some of my experiences.

I had some days that I can’t asleep well in the daytime though I had works in late night because the working hours of our room’s members are inconsistent.

There is a rule that the workers have to declare the day’s conditions of their health by writing and submitting the paper. I wrote 4 about the sleeping hours honesty, but a senior rewrite as 6 while I took my eyes off. I think he judged that the existence of a person who can’t control his health is not good for our company.

And, I saw workers who have much extra jobs except the job which the prime contractor knows. They worked so hard for miscellaneous jobs –for example, caring newcomers’ procedures– and they did their original jobs and drove a car in spite of a few hours sleeping.

Subcontract companies compete or appeal with overwork, then the prime contractor obtain high efficiency works with low cost. But some small unreasonable things and harmful effects are not reported to above. They could lead to serious accident in this emergency.

If someone indicates those problems on the conference, Tepco may just answer “we are going to investigate” or “we ask cooperative companies not to do so.”
And great information never will be reported. Only the evidences not to damage to themselves will be reported to above for having been subcontracted.

Subcontract companies and dishonesty workers are not only responsible for such this situation but also prime contractor or Tepco. Even if some workers or the companies were punished severely, this problem would not be solved.
Stern regulations don’t connect the safety measure. This is the important thing we have to learn from the Train Crash on JR West Fukuchiyama Line(2005), I think.

Tepco has to release weaker people from the pressure that they have to hide their overworks. This is hard to carry senses of mission on their back for many people, so we must not to impose the pressures of labor conditions or instability of employment.

I think we should cope with this problem as whole problem of employment system.
It is best that if Tepco employed all workers and companies. If it is completely unable, I want Tepco to confirm the all workers’ contract situation on their documents completry (though I did not make written agreement), and to check if there are fair wages and insurances.

How about grasping if there are enough people on each posts or companies?
Orginally, outsourcing is not to waive the responsible of administration but to consign technical works. I hear that the accident is barely saved from the worst crisis nevertheless being unpredictable. In this case, it is important to avoid human errors from the halfway administration or caring workers.

And my action went through without someone’s check, it gave an example that there is many ways to pick something by someone who were not satisfied on the present state. This won’t change anything if the security will become improved.
It is proper measure to improve the employment situation not to make workers unsatisfied. I hope mass-medias to ask Tepco and the government these points.


■ The intention of pointing toward the people who watches the video

I wanted to make a opposite direction against the observation. We still have put the workers on nuclear power plant as “an exceptional subject different from us” by changing the word from “lower workers” to “heros” or “working people”
I wanted to point it out. I think we can't avoid this on watching something through a media.

■ the intention of pointing toward myself through the mobile phone

I also watch workers and this accident through the media, so I can't leaving out of this situation, I thought. And this action content a self-sacrifice by narcissism, it should not acknowledge unconditionally in the social crisis. Gloomy mind caused by watching TV show should be eliminated by political participation through elections.
My behavior of working only in a short period should be watched and criticized as a slacktivistic pattern.

More about → Here's the Man Who Pointed Finger at TEPCO's Fuku I Livecam

TEPCO's Extreme Blackout

Diposkan oleh Pengetahuan dan Pengalaman on Wednesday, September 7, 2011

All you can read is about 10 or so lines, according to Tokyo Shinbun citing Kyodo News (9/7/2011).

TEPCO submitted the 12-page document as requested by a Lower House committee concerning the emergency operation procedure at Fukushima I Nuclear Power Plant.

Following the "request" (it was a formal request) from the Nuclear and Industrial Safety Agency to pay close attention to the PP (Physical Protection), TEPCO blacked out almost all of the information, resulting in the document as you see in the picture.

According to TEPCO's Matsumoto, it was part of the document that was blacked. I suppose 99% is still considered "part".

Needless to say, the committee chairman is not very happy, and requested that TEPCO re-submit the document.

The committee requested the information on emergency procedure from TEPCO, as the allegation that manually stopping the IC (emergency cooling system) may have caused the meltdown in Reactor 1, blaming the worker.

I personally don't buy that allegation, particularly when they say it was a "mistake by the worker". (The committee chairman should have asked for the "true" manual...)

You can view the TBS news and see the completeness of the blackout by TEPCO.



More about → TEPCO's Extreme Blackout

TEPCO to Pay 2.4 Billion Yen Into Nuclear Damages Support Organization

Diposkan oleh Pengetahuan dan Pengalaman

The Japanese government is set to set up the Nuclear Damage Support Organization ( 原子力損害賠償支援機構) this week, Yomiuri Shinbun reports (9/7/2011). The law to create the Organization was passed on August 3.

The Organization is basically an insurance scheme for the nation's electric power companies and government corporations that operate nuclear power plants, whereby the companies pay into the scheme to get it started and will pay annual premiums in return for the payment out of the scheme in case of a nuclear accident that will require compensating the victims.

The 12 companies including 9 electric power companies (except for Okinawa Electric that doesn't have a nuclear power plant) will pay in total of 7 billion yen (US$90 million) with TEPCO paying the largest share of 2.4 billion yen (US$31 million), and the national government will match 7 billion yen. So the total amount to be paid into the Organization will be 14 billion yen (US$181 million).

The amount of annual premium is yet to be fully decided.

If the amount of compensation exceeds the money paid into the Organization, the government (i.e. Japanese taxpayers) will pick up the tab.

So far, TEPCO has paid out 112 billion yen (as of August 31) as "temporary" compensation ( to be settled later with receipts). Increase in fuel costs for this year is estimated to be 700 billion yen.

All the cost for "decontamination" of the affected areas will be billed to TEPCO (i.e. taxpayers). In Iitate-mura, Fukushima Prefecture alone, the decontamination project is estimated to cost 200 billion yen for the village of about 6,000 residents.

Many Japanese people highly approve of the scheme, thinking now the victims will be fully compensated. What they may not be aware is that the victims will be fully compensated on their dimes (or yen).
More about → TEPCO to Pay 2.4 Billion Yen Into Nuclear Damages Support Organization

TEPCO to Stop Free Food at J-Village for Fukushima I Nuke Plant Workers

Diposkan oleh Pengetahuan dan Pengalaman on Tuesday, September 6, 2011

or so the tweet by the worker at the plant with big twitter followings says:

そう言えばかなり前につぶやいたJヴィレの配給が14日で最後って通達あったよ。

Oh by the way, like I tweeted some time ago, we're notified September 14 will be the last day of [free food] distribution at J-Village.

J-Village is the staging area for the plant workers. After September 14, TEPCO will make the workers pay for food, if what he tweeted is true.

TEPCO has been bleeding badly financially because of the nuclear accident. The Japanese government, now under the new administration whose approval rate is suspiciously high, continues to pretend it is a problem of a private business. TEPCO does not have a choice but to treat the accident as some maintenance job gone really very bad, and try to come up with a cost-effective patchwork.

And what does the government do (or say it will do)? Embark on the huge "decontamination" projects with government scientists and big corporations and heads of municipal governments that will probably waste billions.

And the Japanese people are still content to be governed.

More about → TEPCO to Stop Free Food at J-Village for Fukushima I Nuke Plant Workers

How 2 Workers Got Wet from Contaminated Water from Kurion's Vessel

Diposkan oleh Pengetahuan dan Pengalaman on Friday, September 2, 2011

TEPCO has a cute illustration of what happened. The worker's error, the company says, of removing the hose without shutting the valve off.



(When the workers get blamed, look for the real cause elsewhere.)



TEPCO's handout for the press on 9/1/2011:





More about → How 2 Workers Got Wet from Contaminated Water from Kurion's Vessel

Worker Died of Acute Leukemia, TEPCO Said in Aug 30 Press Conference

Diposkan oleh Pengetahuan dan Pengalaman on Monday, August 29, 2011

But the doctor assured the company that the death had nothing to do with having worked at Fukushima I Nuclear Power Plant.



The unnamed worker died in early August, after having worked at Fukushima I for about a week. TEPCO's Matsumoto says the company does not know where the worker had worked before he came to Fukushima I. He's from one of TEPCO's 1st-tier subcontractors.



Since the death has nothing to do with having worked in Fukushima I Nuke Plant, TEPCO is not going to track the worker's past work history or conduct further investigation. TEPCO will not release personal information about the worker, either.



The radiation exposure of the worker was 0.5 millisievert external radiation, and zero internal radiation for the duration of his work at Fukushima I.



Additional information from Mainichi (8/30/2011):

The worker was in his 40s. At Fukushima I, his work included manning the rest area and radiation control of the workers. There was no abnormal reading of white blood cells before he started to work at Fukushima I. He worked for about a week in August, and fell ill. He was diagnosed with acute leukemia, and died at the hospital. His company reported his death to TEPCO on August 16.

TEPCO's Matsumoto emphasized that the death was a private matter, and TEPCO had no intention of investigating it further now that the doctor denied any relationship between the death and the work at Fukushima I.

More about → Worker Died of Acute Leukemia, TEPCO Said in Aug 30 Press Conference

Workers Entered Fukushima II (Daini) Reactor 4

Diposkan oleh Pengetahuan dan Pengalaman

While the attention is on Fukushima I, TEPCO has been quietly working on Fukushima II Nuclear Power Plant located in Naraha-machi and Tomioka-machi.



On August 29, workers entered the Containment Vessel of Reactor 4 at Fukushima II for the first time since March 11. No details of the work inside the Containment Vessel have been released by TEPCO yet.



From NHK News (8/29/2011):

東京電力福島第一原子力発電所とともに事故を起こした、福島第二原発では、29日午前中から、4号機の原子炉を覆う格納容器の中に作業員が入り、内部が破損しているかや、放射線の量を調べています。



Workers entered the Containment Vessel of Reactor 4 at Fukushima II Nuclear Power Plant to check the damages if any and measure radiation levels.



福島第一原発と第二原発で、事故のあと、格納容器に人が入るのは初めてです。



It is the first time after the accident that anyone entered the Containment Vessel of any reactor at either Fukushima I or Fukushima II.



福島第二原発は、3月11日の地震で4つの原子炉がすべて自動停止したあと、4号機を含む3つの原子炉では、海水を使って原子炉を冷やす設備の一部が津波によって壊れ、十分に冷やすことができなくなりました。



At Fukushima II, after the automatic shutdown of all 4 reactors after the March 11 earthquake, part of the cooling systems that use seawater to cool the reactors was broken by the tsunami in three of the reactors including Reactor 4, and the reactors were not cooled sufficiently.



このうち、4号機の原子炉は、外部電源を使った冷却によって、地震の4日後に100度以下の冷温停止状態となり、東京電力はその後も原子炉の状態が安定しているとして、29日午前10時すぎから、およそ10人の作業員が原子炉を覆う格納容器の中に入り、内部の調査をしています。



Reactor 4 was brought to a cold shutdown 4 days after the quake using the cooling system with external power supply. TEPCO determined that the condition of the reactor was stable, and sent about 10 workers inside the Containment Vessel to conduct the survey of the inside.



福島第二原発の4号機は、原子炉の圧力が一時高くなるなどしており、東京電力は設備が壊れているかを調べるとともに、内部の放射線量や温度などを測定するということです。



The reactor pressure rose temporarily in Reactor 4 after the quake. TEPCO is going to check for damages as well as measure the radiation levels and temperature inside.



福島第一原発と第二原発で、事故のあと、格納容器に人が入るのは初めてで、東京電力は、29日の調査で得られた結果を基に、今後内部で作業をするために必要な装備などを検討していくということです。



It is the first time since the accident that anyone entered the Containment Vessel in Fukushima I or Fukushima II. TEPCO says it will decide on the necessary work to be done inside the Containment Vessel, once it gets the result of the survey on August 29.

TEPCO is not just working on the Containment Vessel at Fukushima II by the way. It's been working on the heat exchanger for Reactor 4 also, as evidenced by TEPCO's announcement that one worker from a TEPCO affiliate company fell ill due to excess heat in the heat exchanger building while he was re-routing the temporary cable.



What is TEPCO up to? Restart Fukushima II? That's what the mayor of Naraha-machi wants TEPCO to do.



I also wonder whatever happened to the 3000 tonnes of contaminated water in the basement of the plant.

More about → Workers Entered Fukushima II (Daini) Reactor 4

#Contaminated Water Treatment System Comes to a Dead Stop (Again)

Diposkan oleh Pengetahuan dan Pengalaman on Sunday, August 7, 2011

The pumps failed, and TEPCO doesn't know why. Some of the pumps for Kurion's system stopped, and couldn't be restarted. One of the pumps in Areva's system that feed chemicals stopped, and the backup pump didn't work. The entire system is down.

From NHK Japanese (12:30PM JST 8/7/2011):

不安定な状態が続いている東京電力福島第一原子力発電所の汚染水の浄化設備で、7日朝、汚染水を処理するためのポンプが止まったうえに予備のポンプも動かないなどトラブルが相次ぎ、再び運転を停止しています。

The contaminated water treatment system at Fukushima I Nuclear Power Plant has been unstable, but on August 7 morning, the system was stopped after the pumps stopped and the backup pump failed.

... ところが、7日午前7時すぎ、汚染水の浄化設備のうち放射性セシウムなどを取り除くアメリカ製の装置で、汚染水を送る一部のポンプが突然停止し、再起動もできなくなりました。

About 7AM on August 7, some of the pumps that transport contaminated water in the US-made system [Kurion's] that removes radioactive cesium and other nuclides suddenly stopped, and couldn't be re-started.

さらに、午前8時すぎにはフランス製の別の装置でも汚染水に処理用の薬品を混ぜるポンプが停止したうえに予備のポンプも動かず、汚染水の浄化設備のすべての運転が停止しました。

Then about 8AM, a pump that feeds chemicals to the water stopped in the French-made [AREVA's] system, and the backup pump also failed. The entire water treatment system has stopped.

原子炉への注水は処理済みの水を使って続けているということですが、これらの浄化設備を巡っては、4日にも別のポンプが一時停止したほか、5日も警報が鳴って運転が止まるなど不安定な状態が続いています。

Water injection to the reactor continues with the water that have already been treated, according to TEPCO. The treatment system continues to be unstable. On August 4, a different pump stopped temporarily, and on August 5 an alarm sounded off and the system stopped.

東京電力では、より安定的な運転を目指して国産の新しい処理装置を追加して設置していますが、汚染水の保管場所の水位に余裕がないため、この装置の試運転を延期して汚染水の処理を優先することにしていました。

TEPCO has added a new treatment system [made by Toshiba] for more stable operation of the system, but since the water level is very close to the limit in the storage area [Central Waste Processing Facility] TEPCO has delayed the test run of the new system so that they can treat more contaminated water.

東京電力でトラブルの原因を調べるとともに、設備の復旧を急いでいます。

TEPCO is looking into the cause of the trouble, and is trying to get the system back online quickly.

More about → #Contaminated Water Treatment System Comes to a Dead Stop (Again)

TEPCO Is Not Providing English Translation of Its Report to NISA on Emergency Cooling Scheme That Assumes Fuel and Reactors Intact at Fukushima I

Diposkan oleh Pengetahuan dan Pengalaman on Wednesday, August 3, 2011

The Japanese government seems to be "instructing" TEPCO not to release certain information in English.

TEPCO submitted the report to its regulatory agency Nuclear and Industrial Safety Agency (NISA) "on the measures to continue water injection into reactors of Units 1 to 3 at Fukushima Daiichi Nuclear Power Station" on August 3. It's in Japanese only, and it may or may not be translated into English.

According to TEPCO:
We have provided a Japanese press release version of the instruction document received from NISA. However, at this time we have reserved the right not to provide an English version due to potential misunderstandings that may arise from an inaccurate rendering of the original Japanese text. We may provide the English translation that NISA releases in our press releases. However, in principle we would advise you to visit the NISA website for timely and accurate information.

(From TEPCO's English press release on August 3 explaining why they are releasing the information only in Japanese.)

The 34-page Japanese report is here.

It is an excellent report in "Extend and Pretend", full of elaborate diagrams and flow charts, which states that TEPCO will be able to resume water injection into the 3 (broken) reactors at Fukushima I Nuke Plant within 3 hours at most, more likely within 30 minutes, in case of an emergency which causes the water to stop for any reason - pump failure, power outage, even the total station blackout.

It almost makes me wonder that the reason for not providing English translation is not to avoid "potential misunderstanding" but out of embarrassment.

Why? Because:

  • The report talks about the fuel inside the Reactor Pressure Vessels;

  • It talks about the reactors as if they were sound;

  • It states that zirconium will start to interact with water at a certain temperature (1,200 degrees Celsius).

Most likely, there is no fuel left inside the RPVs at Fukushima I Nuke Plant. Even if there is, it is not fuel any more but "corium" - fuel, control rods, instruments, whatever inside the RPV, melted together. TEPCO has already admitted that there are holes in the RPV, and holes in the Containment Vessels. There is no zirconium left because there is no cladding left.

In fact, nowhere in the report does the company say anything about melted fuel, broken reactors, water in the basements, or extremely high radiation at certain locations in the plant.

But the report goes on to describe the elaborate backup pump system and power system as if what they are dealing with is normal (i.e. without cracks or holes at the bottom) reactors with intact fuel rods inside the RPVs with control rods safely deployed in a clean nuclear power plant, and all they need to worry is how they can continue the cooling; or as if the salt-encrusted molten mess of everything that was inside the RPV behaves just the same as normal fuel rods in a normal reactor.

One of the first responses required in almost all emergency cases described in the report requires the plant personnel hurrying to the parking lot on the ocean-side of the main administrative building to carry out the necessary task. What if it's again the earthquake/tsunami situation where the plant workers cannot come to the parking lot? Any contingency plan for that?

No.

Why was TEPCO asked by NISA to submit this report to begin with? So that the national government can begin the discussion with the local municipalities within the 20-kilometer radius evacuation zone for the return of the residents to their towns and villages. The discussion is to begin this month, and TEPCO's report will be used to reassure the residents that Fukushima I Nuke Plant is so stable now with the solid plans (to be approved by NISA, which no doubt will happen very soon) to cool the fuels in the reactors even in case of an emergency.

Remember the mayor of Naraha-machi, where Fukushima II Nuclear Power Plant is located? He wants TEPCO to restart the plant so that 5,000 jobs will return to the town. He also wanted to invite the government to build the final processing plant of spent nuclear fuels in his town. He would be the first one to highly approve of the report so that his town can continue to prosper with nuclear money.

As Haruki "Detarame" Madarame said so well, "It's all about money, isn't it?"

More about → TEPCO Is Not Providing English Translation of Its Report to NISA on Emergency Cooling Scheme That Assumes Fuel and Reactors Intact at Fukushima I

People from All Over Asia Protest in Front of TEPCO Head Office

Diposkan oleh Pengetahuan dan Pengalaman on Tuesday, August 2, 2011

The photo was uploaded on August 2 on Twitpic. The person who took the picture tweeted to one of the independent journalists covering the Fukushima accident as "People from all over Asia are protesting in front of TEPCO's head office right now. Are you aware of that?"

More about → People from All Over Asia Protest in Front of TEPCO Head Office

#Fukushima I Nuke Plant: Humans Enter Reactor 3, Receive 4.61 Millisieverts for 40 Minute Work

Diposkan oleh Pengetahuan dan Pengalaman on Thursday, July 28, 2011

11 TEPCO employees entered the Reactor 3 reactor building on July 27 to measure radiation in locations where they would need to work in order to switch the water injection point to the ECCS pipe for more efficient "cooling" of the "fuel in the RPV".

Looking at the survey map that they did, those locations have particularly high radiation. One particular spot measured 280 millisieverts/hour, and that's where they hope to use for water injection. (See page 3 of TEPCO handout below.)

They also managed to measure the radiation level on the stairs leading up to the 3rd floor, and it was even higher than on the stairs to the 2nd floor, almost twice as high.

TEPCO's July 28 English handout of the survey is full of interesting misspellings, but when they say "bulb", I do believe they meant "valve". To Japanese ears, the difference between "b" and "v" is close to zero, and the difference between "u" in bulb and "a" in valve is non-existent:

(Page 1)


(Page 2)


(Page 3)

One of Fukushima workers who tweets is worried about plutonium in the reactor building. He also said some time ago that the emergency radiation limit for the workers at the plant of 250 millisieverts was applied only to TEPCO employees in practice, while most of the subcontractors were limiting their workers' cumulative radiation below 100 millisieverts. TEPCO has been sending its own employees to the areas with very high radiation.

But when it comes to actually installing pipes and equipment, it will likely be the subcontractors who will have to do the job. It will be people like Mr. Watanabe who was interviewed by The Independent. I don't think TEPCO employees know much about plumbing. 1 minute of work at that highest radiation location, and you will get 2.8 millisieverts.

More about → #Fukushima I Nuke Plant: Humans Enter Reactor 3, Receive 4.61 Millisieverts for 40 Minute Work

Contaminated Water Treatment System at #Fukushima Is Stopped Again

Diposkan oleh Pengetahuan dan Pengalaman on Thursday, July 14, 2011

One post ago, I wrote "The on-again-off-again water treatment system is finally on again". Well that was premature. It's off again.

According to NHK Japanese (7/15/2011), after the contaminated water treatment system was restarted after 30 hours in the evening of July 14, TEPCO noticed that the system was operating at a much reduced rate (37 tonnes/hour) than the system was designed for (50 tonnes/hour). So the company stopped the system in the morning of July 15 and is investigating.

No information as to which part of the system is having a problem, Kurion or AREVA.

Well, either NHK or TEPCO is not telling the truth, because 37 tonnes per hour is 74% operating rate, and that has been about the rate of operation anyway for the system. So why would this alarm TEPCO?
More about → Contaminated Water Treatment System at #Fukushima Is Stopped Again